The M25, A3 and M3 road closures near Heathrow, Guildford and Reigate drivers will want to avoid this week
This week in Surrey drivers will need to take care while travelling on the M25, A3 and M3. Closures will be scheduled overnight which might make journeys longer.
National Highways has ongoing works on several major carriageways, to make routes safer for drivers. This could include drainage work, resurfacing or street lighting maintenance.
Busy areas in particular like on the M25 and the M23 are some of the most used highways cutting through Surrey. A big draw for these Surrey routes are to get to the airports north and south of the county, Gatwick in Sussex and Heathrow.
READ MORE: How to approach major change on A3 that opens today
READ MORE: Girl killed after being hit by falling tree branch in Banstead named locally
Some nights this week, spur roads and link roads will be shut near Heathrow, meaning those planning on travelling on the M4 will need to take alternative routes. Near Gatwick, carriageway closures could mean diversions.
Elsewhere in Surrey, sections of the M3 will be shut, meaning drivers should use local routes. There will also be closures in and around Guildford which drivers will need to be wary of.
Tuesday, November 12
M3 closures
M3 westbound carriageway and entry slip road closure between junction 1 and 2 (Sunbury and Staines). Closure in place from 10pm until 5.30am the following morning
M3 northbound closure between junction 4 (Frimley) and 3 (Bagshot/Lightwater). Closure in place from 9pm until 6am the following morning
A3 closures
A3 northbound closure between Compton and Guildford University. Closure in place from 9pm until 6am the following morning
Wednesday, November 13
M25 roadworks
M25 anti-clockwise junction 8 (Reigate) exit slip road closure. Closure in place from 10pm until 5am the following morning. There will also be lane closures between junction 9 and junction 8 during the works.
M25 will be closed clockwise between junction 13 for Staines/M3 and junction 14 for Heathrow from 10pm until 5am the following morning.
M3 closure
M3 northbound closure between junction 4 (Frimley) and 3 (Bagshot/Lightwater). Closure in place from 9pm until 6am the following morning
Thursday, November 14
M25 closures
M25 anti-clockwise junction 8 (Reigate) entry slip road closure. Closure in place from 10pm until 5am the following morning for maintenance work
M25 clockwise and anti-clockwise closure of the junction 15 link road to the M4 eastbound (junction 4B.) Closure in place from 10pm until 5.30am the following morning
M25 anti-clockwise closure westbound on the Terminal 5 Spur road. Closure in place from 10pm until 5.30am the following morning
A3 closures
A3 northbound Burpham entry slip road closed. Closure in place from 9pm until 6am the following morning
A3 northbound closure from Guildford University to Stoke interchange. Closure in place from 9pm until 6am the following morning
Friday, November 15
M25 closures
M25 clockwise and anti-clockwise closure of the junction 15 link road to the M4 eastbound (junction 4B.) Closure in place from 11pm until 6am the following morning
M25 anti-clockwise closure westbound on the Terminal 5 Spur road. Closure in place from 11pm until 6am the following morning
M25 anti-clockwise junction 7 (Croydon/M23) link road closure to the M23 northbound and southbound (junction 8). Closure in place from 11pm until 5am the following morning
A3 closure
A3 northbound Stoke entry slip road closure. The closure will be in place from 9pm until 5am the following morning for barrier repairs
Saturday, November 16
A3 closure
A3 southbound Thursley entry slip road closure. Closure in place from 9pm until 6am the following morning
Sunday, November 17 - no planned closures
Monday, November 18
M25 closure
M25 anti-clockwise junction 8 (Reigate) entry slip road closure. Closure in place from 10pm until 5.30am the following morning.
A3 roadworks
A3 northbound closure at the Hindhead Tunnel entry slip road. Closure in place from 9pm until 6am the following morning
A3 northbound closure between Compton and Guildford University exit. Closure in place from 9pm until 6am the following morning
A3 westbound and eastbound carriageway closure between Hook Rise and Esher Common junction. Closure in place from 10pm until 5am the following morning